dc.contributor.author |
Flemming, Gannett |
|
dc.contributor.author |
Sawyer, Hazen |
|
dc.date.accessioned |
2013-08-24T00:19:11Z |
|
dc.date.available |
2013-08-24T00:19:11Z |
|
dc.date.issued |
2006 |
|
dc.identifier.citation |
Gannett Flemming, Hazen Sawyer. 2006. Phase II final report Catskill turbidity control study. New York City Department of Environmental Protection, Bureau of Engineering Design & Construction. |
en_US |
dc.identifier.uri |
http://hdl.handle.net/123456789/196 |
|
dc.description.abstract |
This report presents the results of Phase II of the Catskill Turbidity Control Study. The study was undertaken to identify and evaluate feasible, effective, and cost –effective measures for reliably improving the turbidity and temperature control in diversion from the Schoharie Reservoir to the Esopus Creek. Phase II includes conceptual design and performance evaluations for three diversion alternatives. |
en_US |
dc.language.iso |
en_US |
en_US |
dc.publisher |
New York City Department of Environmental Protection, Bureau of Engineering Design & Construction |
en_US |
dc.relation.ispartofseries |
Resource Management Plans;E2 |
|
dc.subject |
Turbidity |
en_US |
dc.subject |
Turbidity Control |
en_US |
dc.subject |
temperature |
en_US |
dc.subject |
Schoharie Reservoir |
en_US |
dc.subject |
Esopus Creek |
en_US |
dc.title |
Phase II final report Catskill turbidity control study. |
en_US |
dc.type |
Technical Report |
en_US |